Skip to content
2Group 02
Control
Pk
Peak Alerts
92%
of contract, sample site

Know about the peak twenty minutes before the meter does.

Maximum demand charges are set by a single bad interval. Peak Alerts forecasts the current demand block from live load, schedules and weather, and warns your team while there is still time to act, with a specific suggestion such as delaying a compressor start or staging a chiller.

tariff blocks supported
15-30 min
automation default setting
Off
alert channels
5
PkPeak Alerts
LIVE
Contract demand
2,000 kVA
Now
1,742 kVA
87% of contract
Forecast close
2,086 kVA
over limit at 14:40
Demand, kVA, 30 min block actual forecast
Contract 2,000Warn 90%14:3014:3614:4214:4814:5415:00
Demand will cross the limit at 14:40

Compressor 3 is scheduled to start at 14:40 while the paint oven ramps.

Suggested actions

Product screen with sample data from a demo plant. Interactive elements respond to clicks.

Element data

Properties of Peak Alerts

The technical facts your engineering and IT teams will ask for.

Forecast horizon
Current and next demand interval
Interval
Matches your tariff: 15 or 30 min blocks
Inputs
Live load, schedules, production plan, weather
Channels
Wall screen, email, SMS, WhatsApp, webhook
Actions
Ranked shed and delay options per load
Automation
Optional, off by default, within limits you set
Reactions

What Peak Alerts does on a working day.

Pk-1

Interval forecast

A rolling forecast of the active demand block, updated every few seconds, so you see where the interval will close, not where it is now.

Pk-2

Suggested actions

Each alert comes with ranked options: which load to delay, by how long, and how much demand it removes. Your team chooses.

Pk-3

Load priorities

Mark loads as critical, flexible or deferrable. Production-critical equipment is never suggested for shedding.

Pk-4

Right person, right channel

Escalation from shift engineer to plant head, by site and by time of day, with acknowledgement tracking.

Pk-5

Optional automation

If you enable it, Ionvik can stage flexible loads through your BMS or PLC, only within the limits and time windows you approve.

Pk-6

Penalty record

Every near miss and every breach is logged with the action taken, so the next contract demand review has evidence behind it.

Process

How it goes live at your site.

  1. 1

    Set limits

    Enter contracted demand, tariff blocks and the warning level you want, for example 90 percent.

  2. 2

    Rank loads

    Tag which machines can be delayed, staged or never touched, and for how long.

  3. 3

    Get warned

    Alerts arrive with a forecast closing value and the cheapest action to stay under the line.

  4. 4

    Review

    Monthly view of avoided penalties and the right contract demand for next year.

Questions

About Peak Alerts

Only if you enable it, and only with limits you set: which loads, for how long, and during which hours. Automatic control is off by default and every action is logged.

It depends on how fast your load moves. For most sites the forecast settles 10 to 20 minutes before the interval closes, which is enough time to delay a start or stage equipment.

Yes. A year of interval data shows how often you approach the limit and what the bill would have been at a different contracted value.

Yes. DG output is read alongside grid import so the forecast reflects the true grid draw.

Reaction 01 · free, no meters to buy

Get your free savings report.

1 month
Bl
Electricity bills
30 days
Md
Meter data
10you keep
Sr
Savings Report
Find your savings free
Uses meters you already haveEstimates labelled as estimatesOr talk it through with us